Bruce A Units 1 and 2 Restart 1
Bruce A Units 1 and 2 Restart 2
Bruce A Units 1 and 2 Restart 3
Bruce A Units 1 and 2 Restart 4

Q1

A Member Of The Waste Management Team Operates A Monitor
that checks waste from the Restart Project for radioactivity. The team is getting geared up for Restart project demobilization.
A Restart Crew Connects The Upper Portion of a Flux Monitor Guide Tube
to its lower portion for vertical insertion into the Unit 2 reactor. New flux monitors are being added to five sites in each of the Unit 1 and 2 reactors as an enhancement for Shutdown System No. 2.
A Review Team Inspects A Maintenance Cooling Heat Exchanger
before final signoffs to declare refurbished service water systems in Unit 2 ready for commissioning. The Unit 1 turbine generator was declared mechanically complete.
Calandria Tube Installation and Testing
continues on the Unit 2 reactor with two thirds of the new tubes now ready for new fuel channel assemblies. Fuel load is scheduled to get underway this fall.
Radiation Protection Instrumentation Specialists
inspect one of the new monitors positioned outside the Unit 1 and 2 reactor vaults to help detect low level alpha radiation on the Restart project.