E - TRANSMISSION

To view a PDF of the exhibit, please click the link on the exhibit number (i.e. E-1-1) or the Attachment.

E-1-1

Structure of Transmission Evidence

E-2-1

Overview of Transmission Planning

E-2-2

Facilitating the Development and Use of Renewable Energy and Enabling 2010 and 2025 Renewable Targets
current version 080505 replaces original

Attachment 1      

All Inclusive LUEC Analysis of Renewable Resources

Attachment 2

Study of Enabler Transmission in other Jurisdictions

E-2-3

Integrating Conservation

E-2-4

Enabling Nuclear

E-2-5

Enabling Natural Gas

E-2-6

Enabling Coal Replacement

E-2-7

Ensuring Reliability

 
Projects to Facilitate and Enable Renewables
 

E-3-1

North-South Transmission Reinforcement
current version 071019 - replaces original

Attachment 1       

IESO System Impact Assessment for North-South Tie Upgrade

Attachment 2

IESO System Impact Assessment for North-South Tie Upgrade – Addendum

Attachment 3

Hardy Stevenson Report for North-South Transmission Reinforcement

E-3-2

Sudbury West Transmission Reinforcement

Attachment 1       

IESO Planning Study for Sudbury West Transmission Capability

E-3-3

Sudbury North Transmission Reinforcement
current version 071019 - replaces original

Attachment 1       

IESO Planning Study for Sudbury North Transmission Capability

Attachment 2

Hardy Stevenson Report for Sudbury North Transmission Reinforcement

E-3-4

East Lake Superior Transmission Reinforcement

Attachment 1       

Great Lakes Power Planning Study for East Lake Superior Transmission Capability

Attachment 2

Hardy Stevenson Report for East Lake Superior Transmission Reinforcement

E-3-5

Manitoba Purchase Incorporation

Attachment 1      

Dillon/Stantec Report

Attachment 2

SNC Lavalin Report

E-3-6

Quebec/Labrador Purchase Incorporation

Attachment 1       

Hardy Stevenson Report for Quebec/Labrador Purchase

E-3-7

Incorporating Little Jackfish and East Lake Nipigon Renewable Resource Development

Attachment 1       

Hardy Stevenson Report for Little Jackfish and East Lake Nipigon Renewable Resource Development

E-3-8

Enabling Goderich Area Renewable Resource Development

E-3-9

Enabling Bruce Peninsula Renewable Resource Development

Attachment 1       

Hardy Stevenson Report for Bruce Peninsula Renewable Resource Development

E-3-10

Enabling Manitoulin Island Renewable Resource Development
current version 071019 - replaces original

Attachment 1       

Hardy Stevenson Report for Manitoulin Island Renewable Resource Development

Projects to Enable Nuclear
 

E-4-1

Oshawa Area Transformer Station
current version 071019 - replaces original

Attachment 1  

   IESO Preliminary Assessment Report: Nuclear
   Scenarios in the GTA East

Projects to Ensure Reliability
 

E-5-1

Northern York Region

Attachment 1       

IESO Report:  System Impact Assessment Report for Holland TS

E-5-2

Kitchener-Waterloo-Cambridge-Guelph
current version 080505 replaces version 071019 and original

Attachment 1       

IESO Report:   System Impact Assessment for Cambridge Preston  115 /230 kV Auto

E-5-3

Southwest GTA
current version 080505 replaces version 071019 and original

Attachment 1       

IESO Preliminary Assessment Report:  Richview – Manby Adequacy

Attachment 2

IESO Preliminary Assessment Report:  Generation Incorporation in Southwest GTA

E-5-4

Windsor/Essex 
current version 071019 - replaces original

Attachment 1       

IESO Report:  System Impact Assessment Report for Belle River TS

E-5-5

Central & Downtown Toronto
current version 071019 - replaces original

Attachment 1       

IESO Preliminary Assessment Report:  Manby/Leaside Normal and Emergency Transfer Study

Attachment 2

IESO Preliminary Assessment Report:  Manby – Leaside Adequacy

Attachment 3

IESO Preliminary Assessment Report:  New Transmission Options to Central Downtown Toronto

Attachment 4

IESO Preliminary Assessment Report:  Distribution Connected Generation in the Leaside 115 kV System

Attachment 5

Hydro One: Summary of Asset Condition and Sustainment Plans for the Leaside and Manby 115 kV System

Attachment 6

Hydro One: Toronto Third Supply Cost Estimates

Attachment 7

Brookfield Power: Toronto Third Supply, HVDC Options for Supplying Downtown Toronto

Attachment 8

Hardy-Stevenson:  Project 7- Central and Downtown Toronto

E-5-6

Milton Transformer Station
current version 071019 - replaces original

 
Projects to Enable Coal Replacement 
 

E-6-1

Thunder Bay Area

E-7-1

Third Party Supporting Evidence referenced within various Transmission evidence exhibits

Attachment 1       

NERC Transmission Planning Standards

Attachment 2

NPCC Document A-2 – Basic Criteria for Design and Operation of Interconnected Systems

Attachment 3

IESO Ontario Resource and Transmission Assessment Criteria (IMO_REQ_0041)