Tab 1
|
Board Staff
current version 080625 replaces 080618
(270 pages/1,528KB)
|
Tab 2
|
Xylene Power Ltd.
current version 080815 replaces 080618
(196 pages/632KB)
|
Tab 3
|
Alliston & District Environment Watch (ADEW)
(8 pages/39KB)
|
Tab 4
|
Assembly of First Nations National Chief’s Office (AFN)
current version 080829 replaces 080618
(66 pages/392KB)
|
Tab 5
|
Association of Major Power Consumers in Ontario (AMPCO)
(202 pages/1,093KB)
|
Tab 6
|
Association of Power Producers of Ontario (APPrO)
(22 pages/118KB)
|
Tab 7
|
Brookfield Energy Marketing Inc. (Brookfield)
(22 pages/142KB)
|
Tab 8
|
Bullfrog Power Inc. (Bullfrog)
current version 080714 replaces 080711 and 080618
(34 pages/653KB)
|
Tab 9
|
Canadian Manufacturers & Exporters (CME)
(72 pages/289KB)
|
Tab 10
|
Canadian Solar Industries Association (CanSIA)
(82 pages/342KB)
|
Tab 11
|
City of Toronto
current version 080625 replaces 080618
(30 pages/140KB)
|
Tab 12
|
Consumers Council of Canada (Council)
(296 pages/2,238KB)
|
Tab 13
|
Council of Canadians (COC)
current version 080815 replaces version 080711 and 080618
(102 pages/9,937KB)
|
|
I-13-29 Attachment 1
|
Net Interchange Last Year.xls
(1,871KB) |
Tab 14
|
Direct Energy Marketing Limited (Direct Energy)
(36 pages/148KB)
|
Tab 15
|
Electricity Distributors Association (EDA)
(18 pages/76KB)
|
Tab 16
|
Enbridge Gas Distribution Inc. (EGDI)
(20 pages/83KB)
|
Tab 17
|
Enbridge Inc.
(6 pages/31KB)
|
Tab 18
|
Enbridge Solutions Inc.
(32 pages/150KB)
|
Tab 19
|
Energy Probe Research Foundation (Energy Probe)
(32 pages/160KB)
|
Tab 20
|
First Nations Energy Alliance (FNEA)
(26 pages/124KB)
|
Tab 21
|
Great Lakes Power Limited (GLPL)
current version 080625 replaces 080618
(64 pages/295KB)
|
Tab 22
|
Green Energy Coalition / Pembina Institute / Ontario Savings Energy Alliance (GEC – Pembina – OSEA)
current version 080914 replaces versions 080815, 080711 080630, 080623 and 080618
(1,438 pages PDF /27,543KB zip file)
|
|
I-22-28 Attachment 1
|
TRC Test Results.xls
(296KB) |
|
I-22-30 Attachment 1
|
TRC calculation from annual costs.xls
(27KB) |
|
I-22-30 Attachment 2
|
PSM output report for No Conservation case.xls
(32KB) |
|
I-22-31 Attachment 1
|
Detail results of the 250 Iterations Stochastic Simulation.xls
filed 080711
(30KB) |
|
I-22-34 Attachment 2
|
Annual costs by technology for Case 1A.xls
(23KB) |
|
I-22-39 Attachment 1
|
Distribution of energy savings by TOU period.xls
(6,140KB) |
|
I-22-48 Attachment 1
|
Estimated Hourly Transmission System Losses (May 2002 – May 2008).xls
current version 080625 replaces 080618
(6,140KB) |
|
I-22-72 Attachment 1
|
Data in Tables 15 and 16 in Exhibit D-5-1.xls
(39KB) |
|
I-22-113 Attachment 1
|
Nuclear Unit Capacity Factors (%) (Bruce, Darlington, Pickering) Since In-service.xls
(20KB) |
|
I-22-113 Attachment 2
|
Plan Nuclear Unit Capacity Factors (%) (2008 -2027).xls
(20KB ) |
|
I-22-114 Attachment 1
|
Bruce Units (Actual) Forced Outage Rates, FOR (%).xls
(15KB) |
|
I-22-114 Attachment 2
|
Pickering and Darlington Units (Actual) Forced Outage Rates, FOR (%).xls
(18KB) |
|
I-22-114 Attachment 3
|
Plan Forced Outage Rates, FOR (%) (2008 - 2027).xls
(25KB) |
|
I-22-115 Attachment 1
|
Bruce Units Planned Outages (actual).xls
(17KB) |
|
I-22-115 Attachment 2
|
Pickering and Darlington Units Planned Outages (actual).xls
(34KB) |
|
I-22-115 Attachment 3
|
Plan Planned Outage rates (%) ( 2008 - 2027).xls
(19KB) |
|
I-22-125 Attachment 1
|
I-22-125 Att 1 Plan Nuclear Capacity - Case1A and Case1B (MW).xls
(15KB) |
|
I-22-125 Attachment 2
|
Plan Nuclear Energy Contributions - Case1A and Case1B (TWh).xls
(18KB) |
|
I-22-187 Attachment 1
|
Plan Robustness Data for Tables and Figures .xls
(268KB) |
|
I-22-190 Attachment 1
|
Reserve Requirement 2008-2014.xls
(17KB) |
|
I-22-191 Attachment 1
|
Data in Table 2 of Exhibit D-2-1.xls
(19KB) |
|
I-22-199 Attachment 1
|
Hydro Production at Peak Hour.xls
(1,820KB) |
|
I-22-205 Attachment 1
|
I-22-205 Att 1 Monte Carlo Inputs and Outputs.zip
(4,594KB - zip file) |
|
I-22-211 Attachment 1
|
Determining Resource Requirements Data for Tables and Figures .xls
(1,243KB) |
|
I-22-222 Attachment 1
|
Meeting Resource Requirements Data for Tables and Figures.xls
(159KB) |
|
I-22-235 Attachment 1
|
CIMS End-Use Technology Market Shares.zip
(1,837KB - zip file) |
Tab 23
|
Lake Ontario Waterkeeper (LOW)
current version 080625 replaces 080618
(36 pages/267KB)
|
Tab 24
|
Métis Nation of Ontario (MNO)
current version 080815 replaces 080618
(56 pages/256KB)
|
Tab 25
|
Not Used
|
Tab 26
|
Northwatch
(100 pages/761KB)
|
Tab 27
|
Northwestern Ontario Municipal Association (NOMA) / City of Thunder Bay / City of Atikokan
(34 pages/142KB)
|
Tab 28
|
Ontario Federation of Agriculture (OFA)
(2 pages/18KB)
|
Tab 29
|
Ontario Mining Association (OMA)
(16 pages/65KB)
|
Tab 30
|
Ontario Waterkeeper Association (OWA) and Canadian Wind Energy Association (CanWEA)
(8 pages/52KB)
|
Tab 31
|
Pollution Probe Foundation (Pollution Probe)
current version 080702 replaces 080625, 080623 and 080618
(296 pages/1,809KB)
|
|
I-31-45 Attachment 1
|
KWCG Demands 2000 to 2007.xls
current version 080625 replaces 080618
(3,000KB) |
|
I-31-65 Attachment 1
|
GTA Demand.xls
(4,906KB) |
Tab 32
|
Power Workers’ Union (PWU)
current version 080904 replaces 080619
(110 pages/618KB)
|
Tab 33
|
Provincial Council of Women of Ontario (PCWO)
(10 pages/45KB)
|
Tab 34
|
Saugeen Ojibway Nations (SON)
(78 pages/1,196KB)
|
Tab 35
|
School Energy Coalition (SEC)
(652 pages/6,693KB)
|
Tab 36
|
Seine River First Nation
(16 pages/68KB)
|
Tab 37
|
Society of Energy Professionals (SEP)
(10 pages/43KB)
|
Tab 38
|
Vulnerable Energy Consumers Coalition (VECC)
current version 080815 replaces 080618
(184 pages/1,144KB)
|
Tab 39
|
Serpent River First Nations
(40 pages/200KB)
|
Tab 40
|
Lake Huron Regional Chiefs
(40 pages/153KB)
|
Tab 41
|
Nipissing First Nation (NFN)
(50 pages/199KB)
|
Tab 42
|
Nishnawbe Aski Nation (NAN)
(164 pages/25,459KB)
|
Tab 43
|
OPA Model Runs
current version 080829 replaces versions 080711, 080625 and 080618
(120 pages/28,593KB zip file)
|
|
|